Convert your checklist into Mobile App

Contact Now

Facility Maintenance Software

Facility maintenance software for PPM planners running HVAC PPM, AMC verification, and statutory plant checks with QR-linked assets aligned to SFG20.

Quick Answer

Facility maintenance software is the platform PPM planners, maintenance managers, and FM engineers use to run preventive maintenance, AMC verification, HVAC and plant rounds, reactive maintenance closure, and statutory equipment checks across single sites and multi-site portfolios with defensible evidence at every step. Inspectly360 digitises field capture aligned to ISO 55001, SFG20, ASHRAE 180, and OEM service intervals with QR-linked assets, offline mobile rounds, and branded PDF exports when technicians close out on site.

AI-Powered Features for Your Field Workflows

Everything your field team does on paper, Inspectly360 does automatically: faster, more accurate, and without the admin.

Take a Photo. AI Fills the Form illustration

Take a Photo. AI Fills the Form

Your inspector takes a photo of any asset or defect. AI reads it and fills the inspection form automatically. No typing. No manual entry.

Speak. AI Writes It Down illustration

Speak. AI Writes It Down.

Inspectors speak their observations in any language. AI transcribes and fills the form in real time. Completely hands-free in the field.

Inspections Done. Report Ready illustration

Inspections Done. Report Ready.

The moment an inspection is submitted, a branded PDF, Excel, or CSV report generates automatically. No manual work. No waiting.

Connect Your Existing Tools illustration

Connect Your Existing Tools.

Inspectly360 integrates with the tools your team already uses, including Zoho, Microsoft 365, and SAP. No double entry.

Live Dashboard. Every Site. Always On illustration

Live Dashboard. Every Site. Always On.

Your operations team sees completion rates, open issues, and compliance scores across all sites in real time. No chasing updates.

Before and After Inspectly360

What changes once facility maintenance software runs on one mobile-first platform with photo proof and live dashboards.

Before Inspectly360

  • CMMS jobs closed without photo proof; auditors challenge whether work occurred. PPM cards behind the AHU door say complete while nobody opened the panel.
  • AMC renewals, lift licences, and PPM dates live in vendor spreadsheets nobody updates. Lapses surface during the audit, not before it.
  • Missed PPM windows backfilled at month-end without supervisor alert. The FM director learns about the lapse from the auditor.
  • Contractor performance assessed anecdotally at contract renewal. Nobody compares completion rate across vendors.
  • Failed items sit in email until someone re-keys them into Maximo or SAP PM hours later.

After Inspectly360

  • Required photos, readings, and sign-off before PPM close-out. Every asset scan loads service history and open CAPA before work starts.
  • Each asset record holds AMC vendor, contract dates, statutory expiry, and PPM cadence. Alerts fire at 90, 60, and 30 days.
  • Real-time escalation when a PPM window passes with asset identity and elapsed time visible on the portfolio dashboard.
  • Live scorecards on completion rate, closure time, and re-open rate per contractor and per site.
  • Failed items push to IBM Maximo, ServiceNow, SAP PM, Planon, or your CMMS as work orders with photo evidence attached.

What Is Facility Maintenance Software, and How Do PPM Teams Use It Across Multi-Site Portfolios?

Facility maintenance software is the platform PPM planners, maintenance managers, and FM engineers use to run preventive maintenance, AMC verification, HVAC and plant rounds, reactive maintenance closure, and statutory equipment checks across single sites and multi-site portfolios with defensible evidence at every step. Inspectly360 digitises field capture aligned to ISO 55001, SFG20, ASHRAE 180, and OEM service intervals with QR-linked assets, offline mobile rounds, and branded PDF exports when technicians close out on site.

The pain it solves is everyday in FM maintenance programmes: PPM cards signed without opening the asset, AMC dates that lapse silently, refrigerant logs compiled the night before an audit, and Friday reconciliation of which AHUs were actually serviced this month. When the client, auditor, or OEM asks for proof, the team searches clipboards and contractor PDFs instead of opening one record.

Inspectly360 combines ready-made templates for HVAC PPM, chiller and boiler rounds, lift and vertical transport checks, AMC verification, and reactive maintenance closure; offline capture in plant rooms; photo evidence on every failed item; corrective actions with named approver verification; and work orders pushed to your CMMS when the technician submits on site.

How Does a Facility Maintenance Programme Run from PPM Round to Verified Closure?

Maintenance teams follow this loop for PPM, AMC, and reactive maintenance cycles.

  1. 1

    Build the Asset Register with QR Tags

    Define assets with QR tags, AMC vendor, PPM cadence, and statutory expiry. Each scan loads service history before work starts.

  2. 2

    Deploy PPM and AMC Template Packs

    Load HVAC, plant, lift, and AMC verification templates aligned to SFG20, OEM intervals, and client contracts.

  3. 3

    Capture Offline in Plant Rooms

    Technicians complete PPM on iOS or Android without signal. Photos and readings cache locally and sync when connectivity returns.

  4. 4

    Push Work Orders to the CMMS

    Failed items route to Maximo, ServiceNow, SAP PM, or your CMMS with photo evidence, asset context, and priority attached.

  5. 5

    Verify Closure and Export PPM Reports

    Issues stay open until a named approver verifies closure on site. PPM and AMC summaries export per site or portfolio.

How Should FM Teams Pilot Digital PPM and AMC Without Disrupting Live Plant?

Answers to common long-tail questions, kept on one canonical page to avoid thin duplicate URLs.

Where Does Inspectly360 Sit Beside the CMMS?

Inspectly360 sits as the field PPM and evidence layer beside Maximo, SAP PM, ServiceNow, and Fiix. The CMMS stays the system of record for work orders and spare parts. Inspectly360 produces the structured PPM evidence and photo proof those systems reference but do not collect in plant rooms.

Pilot Approach for HVAC PPM and AMC Programmes

Most FM teams pilot HVAC PPM or lift statutory checks first on one site or regional cluster. Measure PPM completion defensibility and report assembly speed before portfolio-wide rollout.

Ready to Move Facility Maintenance Off Paper?

Book a Free Demo

How Is This Different from CMMS-Only Workflows, Paper PPM Cards, and Spreadsheet Trackers?

Maintenance managers comparing Inspectly360 to CMMS-only workflows, paper PPM cards, and spreadsheet trackers see the difference fastest on PPM defensibility, AMC compliance per asset, missed-window escalation, contractor scorecards, and CMMS integration without replacing the system of record.

TopicTypical GapsWith Inspectly360
PPM completion defensibilityCMMS jobs closed without photo proof; auditors challenge whether work occurred. PPM cards behind the AHU door say complete while nobody opened the panel.Required photos, readings, and sign-off before PPM close-out. Every asset scan loads service history and open CAPA before work starts.
AMC and statutory compliance per assetAMC renewals, lift licences, and PPM dates live in vendor spreadsheets nobody updates. Lapses surface during the audit, not before it.Each asset record holds AMC vendor, contract dates, statutory expiry, and PPM cadence. Alerts fire at 90, 60, and 30 days.
Missed-window escalationMissed PPM windows backfilled at month-end without supervisor alert. The FM director learns about the lapse from the auditor.Real-time escalation when a PPM window passes with asset identity and elapsed time visible on the portfolio dashboard.
Contractor PPM scorecardsContractor performance assessed anecdotally at contract renewal. Nobody compares completion rate across vendors.Live scorecards on completion rate, closure time, and re-open rate per contractor and per site.
CMMS and EAM integrationFailed items sit in email until someone re-keys them into Maximo or SAP PM hours later.Failed items push to IBM Maximo, ServiceNow, SAP PM, Planon, or your CMMS as work orders with photo evidence attached.

What Changes for PPM Planners, Maintenance Managers, and FM Engineers?

What changes once facility maintenance software is standardised on Inspectly360.

  • PPM Planners: Portfolio view of PPM completion, missed windows, and AMC risk without weekly CMMS exports.
  • Maintenance Managers: HVAC and plant inspections with photo evidence that survives AMC audits and OEM reviews.
  • FM Engineers: QR-linked asset history on the device before opening the panel.
  • Contractors: Clear PPM assignments with due dates and re-inspection rules so closure is verified once.

Which PPM and Maintenance Checklist Templates Should You Try First?

Get started with inspection and audit checklist templates.

View All Checklist Templates
Site Inspection Checklist
Inspections

Site Inspection Checklist

Standard site-level inspections for construction, safety, and compliance. Capture conditions, photos, and follow-ups in one place.

41,000+GET
Asset Inspection Checklist
Asset Management

Asset Inspection Checklist

Inspect assets and equipment: condition, location, photos, and maintenance history. Track condition over time.

28,900+GET
Work Order Checklist
Work Orders

Work Order Checklist

Complete work orders with checklist items, photos, and sign-off. Track completion and proof of work.

31,800+GET
Maintenance Checklist
Maintenance

Maintenance Checklist

Preventive and corrective maintenance inspections. Log repairs, parts, and condition with photos and follow-ups.

27,400+GET

Frequently Asked Questions About Facility Maintenance Software

How does facility maintenance software integrate with IBM Maximo, SAP PM, or ServiceNow?

Failed PPM items push to your CMMS as work orders with photo evidence, asset context, and priority attached. Inspectly360 produces the field evidence layer; the CMMS stays the system of record for work order lifecycle and spare parts.

Does facility maintenance software work offline in plant rooms?

Yes. PPM rounds, readings, and photos cache on the device and sync automatically when connectivity returns.

How quickly can an FM team pilot PPM across active sites?

Most teams run a pilot site within two to three weeks using pre-built HVAC PPM and AMC templates. Phased rollout by region is supported.

How does Facility Maintenance Software support ISO 41001 and OSHA compliance?

Inspectly360 ships templates aligned to ISO 41001, OSHA, and fire NOC with required photo evidence, readings, and sign-off rules, so an incomplete facility maintenance software check cannot close. Statutory due dates attach to each asset, with renewal alerts before they lapse, and branded PDF packs plus searchable history let FM Engineering Managers prove what was checked, when, and by whom when an assessor arrives. Evidence is captured offline in the field and synced to one portfolio record, removing the scramble to rebuild a trail from folders and email before each review.

What does Facility Maintenance Software do?

Facility Maintenance Software is the mobile tool FM Engineering Managers use to run facility maintenance checks across every facilities management site from one app. Field staff complete every check on the device, add notes and photos, and the facility record uploads once back online. Every facility record carries the inspector, the time, and the photos needed to prove the check happened. When an inspector flags a problem, it routes to whoever owns the fix and reports back once it is done.

Less Paperwork. More Visibility.

See Inspectly360 in action with a live demo tailored to your needs. No credit card required.

  • 30 Days Free Trail
  • 1000+ Templates
  • Unlimited Integration